Our Work

landscaping removal construction

Landscaping Removal & Construction Clayton, MO First Bank

Client:

GI Construction

Date:

May 2017

Task:

Remove landscaping, saw cut 20 lineal feet of exposed aggregate. Remove approximately 340 square feet of walk up to 8″ below existing grade. Remove existing stairs, 2 tree rings. Haul off demolition debris and dispose of properly. Plantings, top soil backfill and SOD.

lagoon repairs

Lagoon Repairs & Controlling Vegetation Festus, MO

Client:

MOARNG

Date:

Jun. 2017

Task:

Lagoon repairs. Controlling the vegetation on the lagoon banks, hardening the lagoon banks with rock and creating a spillway.

retaining wall with steps

Retaining Wall with Steps St. Louis, MO

Client:

Larry Van Gels – Homeowner

Date:

Jun. 2017

Task:

Remove and haul off chain link fence and install temporary construction fence. Demolition and haul off asphalt, railroad ties, granular fill, stumps, etc. Regrade hillside to a 3:1 slope. Regrade by deck and excavate for new retaining wall. Build and design new retaining wall with steps and install 2 planter walls. Finish grade disturbed areas and reinstall chain link fence.

construction st charles

Construction of Pinewoods / McClay Detention Basin St. Charles, MO

Client:

St. Charles County

Date:

Oct. 2017

Task:

Construction of the Pinewoods / McClay Detention Basin including removals, grading, outlet control structure and other appurtenances.

rock lining reshaping

Rock Lining Reshaping Neosho, MO

Client:

MOARNG

Date:

Sep. 2017

Task:

Reshaping and rock lining approximately 1,000 lineal feet of ditch. Alternate 2 consists of reshaping and rock lining approximately 100 lineal feet of ditch.

retaining wall

Retaining Wall Nathanial Ct. Hazelwood 63042

Client:

City of Hazelwood

Date:

Aug. 2017

Task:

Remove and replace the existing 361′ retaining wall located on Nathaniel Ct. in Hazelwood, MO.

regrade waterways elevations

Regrade Waterways Elevations Jonesberg, MO

Client:

Jeff O.

Date:

Oct. 2017

Task:

Regrade new waterways, remove and strip topsoil and rock off parking lot. Establish new waterway elevations. Clean off top of water holding tank. Excavate bed pipe, install downspouts and connect to main drain line. Backfill open excavations, rough grade site. Haul in and spread out to finish grade of 4″ clean/2″ clean rock. Finish grade disturbed areas.

concrete asphalt demo

Concrete Asphalt Demo & Haul Off St. Louis

Client:

Stormwater Pro

Date:

Dec. 2017

Task:

Sawcut, demo existing concrete and asphalt and haul off. Using existing fill material to match grading plan. Excavate permeable pavement and bio retention and haul off spoils. Graded lot and hauled in multiple types of rock as extras, sand and rain garden mix.

demolished two houses

Demolished Two Residential Houses Cape Girardeau, MO

Client:

Southeast Missouri State University (SEMO)

Date:

Dec. 2017

Task:

Demolished two houses (including capping and sewer) compaction testing, finish grade and seed and straw.

photo coming soon placeholder

Modular Block Wall Installation Town & Country

Client:

City of Town & Country

Date:

May 2018

Task:

Installation and construction of approximentlly 260 lineal feet of channel stabilization including rock lined channel, revegetation and 150 feet of modular block wall.

windsor retaining wall patio installation

Windsor Retaining Wall Patio Installation Wildwood, MO

Client:

Homeowner Peggy

Date:

Aug. 2015

Task:

Removed existing walkway, laid out new wall,patio and hot tub pad. Trench in 4 perferated drain tiles. Installed hot tub pad, windsor retaining wall and patio. Repair disturbed areas with sod.

boulder wall install

Boulder Wall Install Saddlehorn Ct. St Peters, MO

Client:

Alisha Gastler – Home Owner

Date:

May 2015

Task:

Removal of existing fence, took down a tree. Dug 2 trenches for boulder wall. Placed rock (1″ minus). Place boulders and put granular fill behind walls. Seed and straw disturbed areas.

excavation demo haul off

Excavation, Demo and Haul Off St. Charles 63301

Client:

Vee Jay Cement

Date:

Mar. 2016

Task:

Excavated , demo to full depth, and haul off concrete and asphalt.

exposed sanitary pipes

Exposed Sanitary Pipes St Charles Missouri

Client:

City of St. Charles

Date:

Jul. 2016

Task:

Stabilization of exposed sanitary pipes at 3 distinct project locations. Locations Include: McNair Park, Graystone Dr. and 8 Wimbley Place.

widening trail

Widening Trail Jefferson City, MO

Client:

MOARNG

Date:

Jul. 2017

Task:

Widening an approimately 1,765′ trail by 5′ with rock. Adding a 10′ extention to an existing culvert. Cleaning off an existing boat ramp. Alternate 1 consists of widening an approximately 1,210′ trail by 5′ with rock. Addiing a 10′ extention to existing culvert.

excavate locate sewer lateal

Excavate, Locate Sewer Lateal Saint Peters, 63376

Client:

City of St. Peters

Date:

Apr. 2017

Task:

Excavate and locate sewer lateal in front yard.

water line relocation

Water Line Relocation City St. Peters, MO

Client:

City St. Peters, MO.

Date:

Jun. 2017

Task:

Construction of 250 lineal feet of natural channel stabilization, 77 lineal feet of reinforced concrete box culvert, water line relocation and 173 lineal feet of storm pipe sewers to be replaced with larger pipe or extentions verying in size from 15″ to 24″ in diameter and appurtenances to be constructedon woodlands parkway.

rock lining appurtenances grading

Rock Lining, Appurtenances, Grading City of O’Fallon

Client:

City of O’Fallon

Date:

Aug. 2017

Task:

Construction of 50 feet of rock lining and appurtenances, and grading to create positive drainage.

channel improvements

Channel Improvements City of Wentzville

Client:

City of Wentzville

Date:

Apr. 2017

Task:

Constructing channel improvements to protect city utilities and infastructures. Includes stabilization of channel with rock grade controls, bankstabilization with the designed revement, possible upgrades to utility infastructure and restoration plantings.

box culvert installation

Box Culvert Install Twin Springs Estates

Client:

Ladue, St. Louis County

Date:

Feb. 2017

Task:

Box culvert installation, clearing, grubbing, and demo of existing box culvert.

Parking Lot Removal Missouri Baptist Hospital

Client:

Missouri Baptist Hospital

Date:

May 2014

Task:

We were hired to remove and dispose of an old temporary parking lot and install 6 inches of topsoil to create a new seed bed. We then installed seed and straw.

Removal of Improvements St. Charles Fifth Street

Client:

St Charles County

Date:

May 2014

Task:

We were hired for removal of improvements and site grading for new roadways as well as to re-grade slopes.

Custom Dirt Blends St. Peters Earth Center

Client:

St. Peters City

Date:

May 2014

Task:

We were hired to reclaim old fill dirt into topsoil for recycled use for landscape beds.

Erosion Control Fawn Valley for MSD

Client:

Metropolitan St. Louis Sewer District

Date:

May 2014

Task:

We were hired to fix erosion along a creek channel approximately two miles long. We installed plantable walls and heavy rock along the Fawn valley creek.

Stackable Boulder Wall New Town St. Charles

Client:

New Town

Date:

May 2014

Task:

We were hired to fix erosion along the New Town Lake in St. Charles by installing a large boulder wall.

Office Hours

Monday7am-3pm
Tuesday7am-3pm
Wednesday7am-3pm
Thursday7am-3pm
Friday7am-3pm
SaturdayCLOSED
SundayCLOSED

Request An Estimate








landscaping removal construction

Landscaping Removal & Construction Clayton, MO First Bank

Client:

GI Construction

Date:

May 2017

Task:

Remove landscaping, saw cut 20 lineal feet of exposed aggregate. Remove approximately 340 square feet of walk up to 8″ below existing grade. Remove existing stairs, 2 tree rings. Haul off demolition debris and dispose of properly. Plantings, top soil backfill and SOD.

Lagoon Repairs & Controlling Vegetation Festus, MO

Client:

MOARNG

Date:

Jun. 2017

Task:

Lagoon repairs. Controlling the vegetation on the lagoon banks, hardening the lagoon banks with rock and creating a spillway.

lagoon repairs
retaining wall with steps

Retaining Wall with Steps St. Louis, MO

Client:

Larry Van Gels – Homeowner

Date:

Jun. 2017

Task:

Remove and haul off chain link fence and install temporary construction fence. Demolition and haul off asphalt, railroad ties, granular fill, stumps, etc. Regrade hillside to a 3:1 slope. Regrade by deck and excavate for new retaining wall. Build and design new retaining wall with steps and install 2 planter walls. Finish grade disturbed areas and reinstall chain link fence.

Construction of Pinewoods / McClay Detention Basin St. Charles, MO

Client:

St. Charles County

Date:

Oct. 2017

Task:

Construction of the Pinewoods / McClay Detention Basin including removals, grading, outlet control structure and other appurtenances.

construction st charles
rock lining reshaping

Rock Lining Reshaping Neosho, MO

Client:

MOARNG

Date:

Sep. 2017

Task:

Reshaping and rock lining approximately 1,000 lineal feet of ditch. Alternate 2 consists of reshaping and rock lining approximately 100 lineal feet of ditch.

Retaining Wall Nathanial Ct. Hazelwood 63042

Client:

City of Hazelwood

Date:

Aug. 2017

Task:

Remove and replace the existing 361′ retaining wall located on Nathaniel Ct. in Hazelwood, MO.

retaining wall
regrade waterways elevations

Regrade Waterways Elevations Jonesberg, MO

Client:

Jeff O.

Date:

Oct. 2017

Task:

Regrade new waterways, remove and strip topsoil and rock off parking lot. Establish new waterway elevations. Clean off top of water holding tank. Excavate bed pipe, install downspouts and connect to main drain line. Backfill open excavations, rough grade site. Haul in and spread out to finish grade of 4″ clean/2″ clean rock. Finish grade disturbed areas.

Concrete Asphalt Demo & Haul Off St. Louis

Client:

Stormwater Pro

Date:

Dec. 2017

Task:

Sawcut, demo existing concrete and asphalt and haul off. Using existing fill material to match grading plan. Excavate permeable pavement and bio retention and haul off spoils. Graded lot and hauled in multiple types of rock as extras, sand and rain garden mix.

concrete asphalt demo
demolished two houses

Demolished Two Residential Houses Cape Girardeau, MO

Client:

Southeast Missouri State University (SEMO)

Date:

Dec. 2017

Task:

Demolished two houses (including capping and sewer) compaction testing, finish grade and seed and straw.

Modular Block Wall Installation Town & Country

Client:

City of Town & Country

Date:

May 2018

Task:

Installation and construction of approximentlly 260 lineal feet of channel stabilization including rock lined channel, revegetation and 150 feet of modular block wall.

photo coming soon placeholder
windsor retaining wall patio installation

Windsor Retaining Wall Patio Installation Wildwood, MO

Client:

Homeowner Peggy

Date:

Aug. 2015

Task:

Removed existing walkway, laid out new wall,patio and hot tub pad. Trench in 4 perferated drain tiles. Installed hot tub pad, windsor retaining wall and patio. Repair disturbed areas with sod.

Boulder Wall Install Saddlehorn Ct. St Peters, MO

Client:

Alisha Gastler – Home Owner

Date:

May 2015

Task:

Removal of existing fence, took down a tree. Dug 2 trenches for boulder wall. Placed rock (1″ minus). Place boulders and put granular fill behind walls. Seed and straw disturbed areas.

boulder wall install
excavation demo haul off

Excavation, Demo and Haul Off St. Charles 63301

Client:

Vee Jay Cement

Date:

Mar. 2016

Task:

Excavated , demo to full depth, and haul off concrete and asphalt.

Exposed Sanitary Pipes St Charles Missouri

Client:

City of St. Charles

Date:

Jul. 2016

Task:

Stabilization of exposed sanitary pipes at 3 distinct project locations. Locations Include: McNair Park, Graystone Dr. and 8 Wimbley Place.

exposed sanitary pipes
widening trail

Widening Trail Jefferson City, MO

Client:

MOARNG

Date:

Jul. 2017

Task:

Widening an approimately 1,765′ trail by 5′ with rock. Adding a 10′ extention to an existing culvert. Cleaning off an existing boat ramp. Alternate 1 consists of widening an approximately 1,210′ trail by 5′ with rock. Addiing a 10′ extention to existing culvert.

Excavate, Locate Sewer Lateal Saint Peters, 63376

Client:

City of St. Peters

Date:

Apr. 2017

Task:

Excavate and locate sewer lateal in front yard.

excavate locate sewer lateal
water line relocation

Culvert Improvements Woodlands Parkway St. Peters, MO

Client:

City St. Peters, MO.

Date:

Jun. 2017

Task:

Construction of 250 lineal feet of natural channel stabilization, 77 lineal feet of reinforced concrete box culvert, water line relocation and 173 lineal feet of storm pipe sewers to be replaced with larger pipe or extentions verying in size from 15″ to 24″ in diameter and appurtenances to be constructedon woodlands parkway.

Slope Stability Project Feise Forest Ct. O’Fallon, MO

Client:

City of O’Fallon

Date:

Aug. 2017

Task:

Construction of 50 feet of rock lining and appurtenances, and grading to create positive drainage.

rock lining appurtenances grading
channel improvements

Channel Improvements Brian Ct. Phase 2 Wentzville 63385

Client:

City of Wentzville

Date:

Apr. 2017

Task:

Constructing channel improvements to protect city utilities and infastructures. Includes stabilization of channel with rock grade controls, bankstabilization with the designed revement, possible upgrades to utility infastructure and restoration plantings.

Box Culvert Install Twin Springs Estates

Client:

Ladue, St. Louis County

Date:

Feb. 2017

Task:

Box culvert installation, clearing, grubbing, and demo of existing box culvert.

box culvert installation

Parking Lot Removal Missouri Baptist Hospital

Client:

Missouri Baptist Hospital

Date:

May 2014

Task:

We were hired to remove and dispose of an old temporary parking lot and install 6 inches of topsoil to create a new seed bed. We then installed seed and straw.

Removal of Improvements St. Charles Fifth Street

Client:

St Charles County

Date:

May 2014

Task:

We were hired for removal of improvements and site grading for new roadways as well as to re-grade slopes.

John Luecke, the owner of JTL Landscaping, LLC, is a hands on employer. You will see him at every job site. If not checking on the employees, he will be running the equipment or doing labor work that needs to be done.

Custom Dirt Blends St. Peters Earth Center

Client:

St. Peters City

Date:

May 2014

Task:

We were hired to reclaim old fill dirt into topsoil for recycled use for landscape beds.

Erosion Control Fawn Valley for MSD

Client:

Metropolitan St. Louis Sewer District

Date:

May 2014

Task:

We were hired to fix erosion along a creek channel approximately two miles long. We installed plantable walls and heavy rock along the Fawn valley creek.

Stackable Boulder Wall New Town St. Charles

Client:

New Town

Date:

May 2014

Task:

We were hired to fix erosion along the New Town Lake in St. Charles by installing a large boulder wall.